Fast Lift between Ground and Floor 400. TKE installed in 2011. We all known why you ride this lift. Make this the best lift out there. TKEs need love.
Thanks to numberboy9 for the original project ThyssenKrupp Mid/High Rise Lift Ride Redux. -Whoever made the music