Credit to @vorpsawy and @halfai93294 for the original project, @Jon5432 for the logic and button press noise, and @Get_Help for the engine and door noise.
VE Approx HydroDrive Elevator | Cigupqe Apartments, Asurha, Central NDC Project #204 of NDF Elevator Info: Model: VE-Approx HyprDrive Engine: Approx TX-20 Fixtures: VE SPDF-100 Installed By: Approx Instalation Date (DD/MM/YY): 3/1/2022 ----------------------------------------------------------------- Lift Background: This is a lift at an apartment complex in Asurha, Central New Diamond City. The building construction started in December 2021 and was finished 2 months ago (January). The lift was installed 2 days after the building was completed. The apartment complex is like around 10 floors. However apart from this lift, they managed to get away from mandatory accessibility laws for some strange reason, with ramps leading to nowhere. This until in 7/4/2022 which they will be forced to install a platform lift or reposition the ramps to comply with those accessibility laws. (Remember that this project currently takes place in 20/3/2022 right now)