ScratchData LogoScratchData
Back to AlphaCorp178's profile

Alpha Corporations DMR V2.3 + Power Plant

ALAlphaCorp178•Created April 30, 2021
Alpha Corporations DMR  V2.3 + Power Plant
33
32
450 views
View on Scratch

Instructions

spam flag. How to get to the rest of the facility: open seal and wait for it to finish opening only managers of Alpha Corp and @Develop3r can get past check point How to work the reactor : 1.) close blast door 2.) put on suit (after this you can open blast door but keep your suit on) 3.) set core status to on in the drop down menu. red=close green=open. Emergency cooldown has a 50% chance of failing and sending core temp to high levels. shut down must be below 3000K. Keep an eye on coolent.

Description

currently re-doing some old art building cost: 26,571,437,973.50 SGC's CREDIT: @dojoman500 for some sound. @AlphaCorp178 for programing and most of the art @Develop3r for sounds and inspiration and part of reactors 1-5 art and part of hand print scanner art. @videogameplayer179 for Evac van and helicopter art. @Radioactive278 for 1 radiation sign @theanonymousweirdo for an encoding and decoding script it takes 2 generators to power 1 city 3700+ blocks 90+ sprites 360+ assets turbowarp: https://turbowarp.org/523698575 use with credit. if credit not given i will warn you. if credit still not given 12 reports will be issued. i don't like saying things like this but i spent 3 months on this. #alpha #corp #games #reactor #dmr #control #radiation #all #simulator #simulators #nuclear

Project Details

Project ID523698575
CreatedApril 30, 2021
Last ModifiedDecember 8, 2023
SharedJune 12, 2021
Visibilityvisible
CommentsAllowed