“After the massive success of the M-1–which we had almost 520 built—our CEO, Bob May Walters has ordered more locomotives to be built to be added to the fleet. A proposal for a Berkshire and Mikado was accepted. I took a photo during the construction of the Mikado. We will decide the roles of the mikado when it is done building.” - Adam Forsyth, 13 years at the factory.
Chessie-2101 StrasburgRRFan Migscratch10 BrandonTheCubanMogul