Green flag, wait 1 second
Credit to all respectful owners Would occur when a security breach occurs that cannot be contained. Pre-phase is Total Facility Lockdown, and preperation for ESDS(With an Evacuation Phase during Pre-ESDS). Phase 1 is the breach of the lockdown system, and the activation of the ESDS. Phase 2 is Total ESDS, and total destruction of the reactor core, and facility.